The business of defense

The Growth OfficersGet the Weekly
Thursday, November 26, 2026

Edition

The business of defense, November 25

Contracts · Contracts

aircraft wiring harnesses laid out on a large layout board beside unmarked equipment racks in a clean hangar, soft daylight through high windows.
Illustration.

Navy exercises $1.13 billion in Northrop Grumman E-130J development options

The modification covers three system demonstration test articles and initial spares, with $4.18 million to be obligated at award.

The Navy has exercised options for Northrop Grumman Systems Corp. to design, develop and deliver three E-130J system demonstration test articles and initial spares. The $1.13 billion cost-plus-incentive-fee modification, announced Nov. 25, supports engineering and manufacturing development under an existing contract.1

Northrop Grumman awarded $1.13 billion E-130J development modification

Modification value and award-time funding, USD | Nov. 25, 2026

$1,130,397,498Awarded cost-plus-incentive-fee modification exercising development options
$4,180,000Fiscal 2027 research, development, test and evaluation funds to be obligated at award

The funds to be obligated at award are funding under the modification, not an additional contract value.

Source: Department of War, Contracts for Nov. 25, 2026. As of Nov. 25, 2026.

TGOs tgos.io

The E-130J program will integrate specialized, secure communications systems into government-furnished C-130J-30 aircraft to recapitalize the Navy's Take Charge and Move Out strategic communications mission.1

Work is expected to finish in January 2030. Melbourne, Florida, accounts for 35% of the work and Marietta, Georgia, for 23%. Naval Air Systems Command is the contracting activity.1

The development award supports the Navy's strategic communications recapitalization, but its full value is not being obligated at award. The announcement lists $4.18 million in fiscal 2027 research, development, test and evaluation funds to be obligated at that point.1

Sources (1)
  1. Contracts for Nov. 25, 2026, Department of War www.war.gov

Contracts · Electronic warfare

an aircraft wing panel on a test stand in a clean hangar, with wiring harnesses and plain metal modules on a workbench beside it. soft morning light through high windows.
Illustration.

Navy plans sole-source Boeing contract for Growler Beowulf development

The planned follow-on work covers prototypes and aircraft integration for U.S. and Australian EA-18Gs, with capability statements due Dec. 10.

The Naval Air Systems Command (NAVAIR) plans a sole-source follow-on contract with Boeing to design, develop, integrate and test the Growler Block II Phase 2 AN/ALQ-264(V) Beowulf system. The Nov. 25, 2026 presolicitation covers work for U.S. Navy and Royal Australian Air Force cooperative EA-18G aircraft.1

Intention to award a sole source contract with The Boeing Company

Growler Block II Phase 2 Beowulf system

The Boeing CompanyCost-Plus-Incentive-Fee (CPIF)planned

follow-on Cost-Plus-Incentive-Fee (CPIF) contract with a Firm-Fixed-Price (FFP) option Contract Line Item Number (CLIN) for hardware

Capability statementssole source acquisition approachplanned

will utilize the capability statements received solely to confirm the sole source acquisition approach or to reconsider a competitive procurement.

The notice is not a request for competitive proposals

Source: Naval Air Systems Command, SAM.gov

Sources
TGOs tgos.io

NAVAIR bases its sole-source approach on Boeing's role as the F/A-18E/F and EA-18G contractor, citing its manufacturing knowledge, experience and technical data needed to meet the requirement on time.1 The command invokes the only-one-responsible-source authority under 10 U.S.C. 3204(a)(1).1

The presolicitation follows a Nov. 5 sources-sought notice that already said NAVAIR intended to solicit Boeing for the follow-on contract.2–3 That earlier notice sought information about capable firms before the Navy determined its acquisition method.3

The planned contract is cost-plus-incentive-fee, with a firm-fixed-price hardware option. Its scope includes non-recurring engineering, eight prototype Beowulf inboard leading-edge flaps, sensor control units and power control units. It also covers flight software and firmware, flight qualification and test support, aircraft integration, laboratory test assets, a validated technical data package and logistics products. An option would cover long-lead material in fiscal 2030.1

The earlier notice anticipated a 60-month performance period. It gave a window from March 2028 through March 2033.3 The Nov. 25 notice gives no performance period, award date or dollar value.1

The Navy will use capability statements solely to confirm its sole-source approach or reconsider competition; this notice is not a request for competitive proposals.1 Other firms have until 11:59 p.m. Eastern on Dec. 10 to submit statements demonstrating their ability to perform the work, with proof of the necessary approved facility and personnel clearances.1

Sources (3)
  1. SAM.gov presolicitation N00019-26-RFPREQ-TPM265-0547, posted Nov. 25, 2026 sam.gov
  2. SAM.gov notice history sam.gov
  3. SAM.gov sources-sought notice, posted Nov. 5, 2026 sam.gov

Contracts · Naval systems

an array of generic ship antennas on a steel test frame in a shipyard workshop, with neat cable harnesses and soft daylight through high windows.
Illustration.

Elbit's German unit wins F-128 frigate electronic warfare contract

Under a five-year contract with TKMS, Elbit Systems Deutschland will supply Aqua Marine self-protection suites for the German Navy's F-128 frigates.

Elbit Systems Deutschland, Elbit Systems' German subsidiary, has been awarded a contract with TKMS to supply electronic warfare suites for the German Navy's F-128 frigates, Elbit announced Nov. 24. The contract will be performed over five years.1

Elbit Systems Deutschland will supply the Aqua Marine

for the German Navy's F-128 frigates

self-protection suiteAqua Marineplanned

Under the contract with TKMS, Elbit Systems Deutschland will supply the Aqua Marine integrated naval EW self-protection suite for the German Navy's F-128 frigates

performance period5 yearsplanned

The contract will be performed over a period of 5 years.

Source: Elbit Systems, Nov. 24, 2026

Sources
TGOs tgos.io

The subsidiary will supply Aqua Marine, an integrated naval electronic warfare self-protection suite. Elbit describes the suite as combining passive and active capabilities to detect, identify and analyze threats, alongside electronic self-defense and electronic attack capabilities.1

The award brings Elbit's self-protection suite onto the F-128 program through TKMS, which Elbit Systems Deutschland CEO Marian Rachow identified as the prime contractor. Rachow said the companies' relationship has grown through various joint projects. Elbit's announcement states no contract value or number of frigates or suites.1

Sources (1)
  1. Elbit Systems, "Elbit Systems Awarded a Contract to Supply Naval EW Suites for Germany," Nov. 24, 2026 www.elbitsystems.com

Industry · Hypersonics

a large cylindrical metal test article resting on a cradle beside an open thermal test chamber in a clean assembly hall, under soft white light.
Illustration.

First Dark Eagle battery fully fielded, Army fires acquisition executive tells Breaking Defense

Breaking Defense reports work continues on two more hypersonic batteries, while Program Acquisition Executive for Fires Lt. Gen. Frank Lozano wants additional vendors to expand production options.

The Army’s first battery of Dark Eagle, its Long Range Hypersonic Weapon, is “fully fielded,” Lt. Gen. Frank Lozano, Program Acquisition Executive for Fires, told Breaking Defense in a Nov. 19 interview. Lozano said the soldiers have everything needed to employ the weapon, but declined to disclose when or where the battery was fielded.1

Breaking Defense reports the Army has officially fielded its first Long Range Hypersonic Weapon battery

Lt. Gen. Frank Lozano, Program Acquisition Executive for Fires

first batteryfully fieldedactual

in an interview with Breaking Defense on Nov. 19

second and third batteriesworking to fieldplanned

Lozano could not say when due to operational security

Lozano declined to disclose when or where the first battery was fielded

Reported by Breaking Defense, November 25, 2026

Sources
TGOs tgos.io

The Army is working to field the second and third batteries, Lozano said. Lozano said the service is already over halfway through production of the third battery. He declined to give their readiness dates, citing operational security concerns.1

Breaking Defense cited a July Government Accountability Office report that the Army and Navy paused production to address testing problems and that Lockheed Martin continued to experience issues at its facility. Lozano declined to detail the manufacturing issues, but said preventing similar problems would require more rigorous qualification testing of individual missile components.1

The first battery missed the Army’s initial 2023 fielding goal and a subsequent September 2025 target, Breaking Defense reported. The outlet cited Bloomberg’s reporting that fielding remained incomplete in October 2026, when the program office said more training, sustainment and readiness work was needed. Lozano declined to call that report inaccurate. Asked when full fielding occurred, he pointed to some of the weapon’s ground support equipment delivered as early as 2021, which he said made a specific date difficult to identify.1

Breaking Defense reported that Lozano indicated the Army could eventually open Dark Eagle to additional vendors. His stated preference is for two or three vendors producing against a single requirement, which he said would give him more production flexibility and options.1

Sources (1)
  1. Breaking Defense: First Dark Eagle hypersonic battery 'fully fielded,' Lozano says (Nov. 25, 2026) breakingdefense.com

Budget · Israel

Israeli committee approves $5 billion defense budget increase, Breaking Defense reports

Breaking Defense reports that Israel’s defense minister links the 2026 addition to long-term procurement plans in space, attack helicopters and air defense.

Israel’s Joint Committee on the Defense Budget approved a $5 billion defense budget increase, Breaking Defense reported Nov. 25. Defense Minister Israel Katz described the addition to the 2026 budget as approximately NIS 17.3 billion.1

Israeli committee approves defense budget increase, Breaking Defense reports

2026 defense budget addition, U.S. dollars

$5 billionCommittee-approved increase

Reported by Breaking Defense, Nov. 25, 2026

TGOs tgos.io

Katz said the approval would enable Israel to advance plans for self-reliance in long-term procurement covering space, attack helicopters, air defense and other classified areas.1

The committee’s approval follows a September defense budget increase and an October agreement to fund Apache helicopter purchases. Breaking Defense reported that earlier increases drew money from other ministries, including Transport, National Security and Education.1

Breaking Defense reports that budget shortfalls will stretch into 2027.1

Sources (1)
  1. Breaking Defense: Israel increases defense budget by $5 billion as concerns continue over future funding breakingdefense.com

Contracts · Foreign military sales

a plain curved aluminum aircraft panel on supports in a quiet maintenance hangar, soft morning light through open doors.
Illustration.

State Department approves possible $621.9 million F-16 sustainment sale to Ukraine

Belgium, Denmark, the Netherlands and Norway would finance the purchase, with principal contractors to be selected through U.S. government competitions.

The State Department approved a possible Foreign Military Sale to Ukraine for F-16 sustainment and related equipment, with an estimated total cost of $621.9 million. The congressional notification is dated Nov. 25, 2026.1

State approved a possible FMS to Ukraine for F-16 aircraft sustainment

Possible Foreign Military Sale (FMS)

Estimated total cost$621.9 million

The estimated total cost is $621.9 million.

Principal contractor(s)Competitive procurementsplanned

The principal contractor(s) will be selected through competitive procurements conducted by the U.S. Government in accordance with the Federal Acquisition Regulation (FAR).

Source: U.S. Department of State. As of November 25, 2026.

Sources
TGOs tgos.io

Ukraine would use funding from Belgium, Denmark, the Netherlands and Norway through the Joint Ukraine Multinational Program – Services, Training and Articles Rapid Timeline (JUMPSTART). The transfer would involve no U.S. funds.1

Ukraine requested cartridge actuated devices/propellant actuated devices, lab equipment and transportation support. These would be added to a previously implemented case whose value was below the congressional notification threshold.1

For F-16 support suppliers, principal contractor selection remains ahead: the U.S. government would conduct competitive procurements under the Federal Acquisition Regulation. The approval covers a possible sale and does not constitute a contract award.1

Sources (1)
  1. State Department, Bureau of Political-Military Affairs: Ukraine – F-16 Aircraft Sustainment (Transmittal #26-98), Nov. 25, 2026 www.state.gov

M&A

a machined metal aircraft hydraulic control assembly on a clean inspection bench, with precision tools beside it and a bright manufacturing workshop behind.
Illustration.

Parker Hannifin completes CIRCOR Aerospace acquisition

Parker expects CIRCOR Aerospace to add about $270 million in annual sales at an adjusted EBITDA margin above 40%.

Parker Hannifin, a motion and control technology company, announced on Nov. 24, 2026 that it had completed its acquisition of CIRCOR International’s Commercial and Defense Aerospace business. The acquired business makes and supports flight-critical motion and flow control products for commercial aircraft and defense applications.1

CIRCOR Aerospace is expected to add approximately $270 million in annual sales

balanced 50/50 sales across commercial and defense programs

adjusted EBITDA$109 million (40.6% margin, unaudited, non-GAAP)planned

Forecasted 12 Months Ending 12/31/26 (Unaudited)

expected cost synergies$26 millionplanned

Parker's reconciliation lists expected cost synergies of $26 million by the end of the third full fiscal year.

Source: Parker Hannifin release, Nov. 24, 2026. Data as of Nov. 24, 2026.

Sources
TGOs tgos.io

The business has a 50/50 sales split between commercial and defense programs and will be reported in Parker’s Aerospace Systems segment.1

Parker agreed in May to a $2.55 billion cash purchase price on a cash-free, debt-free basis. The price includes expected tax benefits with an estimated net present value of approximately $75 million. Net of expected tax benefits, Parker valued the transaction at 22.7 times CIRCOR Aerospace’s estimated calendar 2026 adjusted EBITDA.2

The unaudited calendar 2026 forecast in Parker’s release puts CIRCOR Aerospace sales at $270 million. Adjusted EBITDA, a non-GAAP measure, is forecast at $109 million.1

Beyond the forecast adjusted EBITDA used in the purchase multiple, Parker expects $26 million in cost synergies by the end of the third full fiscal year.1–2

Sources (2)
  1. Parker Hannifin release, Nov. 24, 2026 investors.parker.com
  2. Parker Hannifin release, May 21, 2026 investors.parker.com

Capital · Foreign industrial policy

a quiet government meeting room with a long wooden table, closed binders and leather chairs, afternoon light through tall windows.
Illustration.

MAP: Morocco puts defense industry funding estimate at nearly 22 billion dirhams

Two framework agreements cover financing and private and financial sector involvement in Morocco's roadmap to develop its defense and security industry, MAP reports.

Ali Seddiki, director-general of the Moroccan Investment and Export Development Agency, said public partners helped secure funding estimated at nearly 22 billion dirhams for the defense and security industry roadmap. At the Nov. 25 signing of two framework agreements in Rabat, chaired by King Mohammed VI, one covered financing; the other concerned mobilizing the private and financial sectors, Maghreb Arabe Presse (MAP) reported. Signers of the latter include the Bank Al-Maghrib governor and heads of the banks' association and Casablanca Stock Exchange.1

Funding estimated at nearly 22 billion dirhams

Defense and security industry roadmap

estimated at nearly 22 billion dirhams

AMDIE director-general Ali Seddiki said public partners helped secure funding estimated at nearly 22 billion dirhams for the defense and security industry roadmap, in a speech before King Mohammed VI at the 25 November 2026 signing ceremony

Manufacturers based in Morocco40%planned

Seddiki said implementing the royal guidelines will enable manufacturers based in Morocco to meet 40% of the needs of the Royal Armed Forces and security agencies

Reported by Maghreb Arabe Presse (MAP), Nov. 25, 2026

Sources
TGOs tgos.io

Seddiki said implementing the royal guidelines would enable manufacturers based in Morocco to meet 40% of the needs of the Royal Armed Forces and security agencies. At full term, Seddiki said, the industry is expected to generate at least 50 billion dirhams in annual revenue, more than 65% from exports.1

The King named a planned strategic agency the Defense Industry Facilitation and Acceleration Agency (DIFAA). It is to foster weapons production, mainly drones and autonomous systems, land and naval systems, defense electronics and cyberdefense, as well as artificial intelligence.1

DIFAA is to promote investment, manage support mechanisms and structure Morocco's defense industrial base, MAP reports. Its planned tools include industrial offsets, public procurement, real estate, skills and innovation.1

Sources (1)
  1. MAP: King chairs signing of two framework agreements on defense and security industry financing, Nov. 25, 2026 www.mapnews.ma

Contracts · Enterprise IT

a quiet server room with rows of plain unmarked metal cabinets and a single overhead cable tray, soft white light.
Illustration.

DISA extends enterprise identity prototype submission deadline to Dec. 7

DISA issued combined answers to vendors’ questions and clarified requirements. A successful prototype could lead to a production award without further competition.

The Defense Information Systems Agency (DISA) extended the solution brief deadline for its Next Generation Enterprise Identity, Credential, and Access Management prototype to noon CST Dec. 7, 2026.1, 4 The previous deadline was 5 p.m. Central Nov. 30.3

Responses to the AOI are now due Dec. 7, 2026 by 12:00PM CST

Area of Interest (AOI) for Next Generation Enterprise Identity, Credential, and Access Management (E-ICAM) Prototype Other Transaction (OT)

The amendment says the Phase I Solution Brief submission deadline has been extended

7 December 2026, 12:00 p.m., CST

AOI document lists Solution Briefs due 7 December 2026, 12:00 p.m., CST

The Nov. 23 version (Amendment 0003) still listed the Nov. 30, 2026 17:00 Central deadline

Source: sam.gov. As of Nov. 25, 2026.

Sources
TGOs tgos.io

DISA seeks a modular, cloud-hosted commercial off-the-shelf or software-as-a-service solution to modernize legacy identity infrastructure across Impact Level 5 and 6 environments.1 Successful completion of a prototype Other Transaction could lead to a follow-on production contract or transaction without further competition. The Area of Interest (AOI) says that follow-on could be significantly larger than the prototype, but states no estimated value for either.4

Amendment 0004, posted Nov. 25, provides combined government answers to submitted questions and clarifies the AOI and Appendix A. The notice says requests for the controlled answers attachment should come from the company’s Data Custodian and include a Joint Certification Program (JCP) certification number.1

The government seeks unlimited data rights to the technical data package, including complete software source code and technical documentation. It will prefer submissions offering test licenses at no additional cost, and proposed work should generally run no longer than nine months.4

Companies need active JCP certification to access Attachment 1, which contains controlled, non-public technical architecture specifications. The AOI says DISA will not extend the deadline for offerors awaiting JCP processing.4

Sources (4)
  1. SAM.gov notice DISA-OTA-27-R-ICAM, Amendment 0004 posted Nov. 25, 2026 sam.gov
  2. SAM.gov notice history sam.gov
  3. SAM.gov Nov. 23 version sam.gov
  4. Area of Interest document sam.gov

Contracts · Sensors

an array of flat metal panels on a test stand inside an anechoic chamber lined with foam wedges, under soft white light.
Illustration.

Pentagon’s planned radar integrator would be barred from competing for the program’s prototype awards

The selected company would help choose suppliers and be responsible for on-time prototype delivery under a proposed agreement estimated to last 60 months, subject to funding.

Army Contracting Command-Rock Island plans to seek an integrator to support the Department of War’s multi-band active electronically scanned array radar prototyping. The selected company would help choose suppliers but could not compete as a performer for prototype awards under the program.1

The integrator assists WIRE with the competitive selection of DIB suppliers

Multi-Band Active Electronically Scanned Array (AESA) Radar (M-BAR) Integrator

competitive selectionDefense Industrial Base (DIB) suppliersStated scope

The integrator assists WIRE with the competitive selection of Defense Industrial Base (DIB) suppliers

prototype awards under the programwill be strictly restricted from competingplanned

the selected integrator will be strictly restricted from competing as a performer for DIB prototype awards under the program

Warfighting Investments, Resourcing, and Execution (WIRE) Directorate Program

This Special Notice is for planning purposes only

Source: SAM.gov special notice CS-27-1802. As of Nov. 25, 2026.

Sources
TGOs tgos.io

The effort’s stated goal is to strengthen and expand the industrial base for low size, weight and power multi-band sensors. The restriction on the integrator is intended to maintain competitive objectivity.1

The integrator would provide program management and systems engineering support to the department’s Warfighting Investments, Resourcing, and Execution (WIRE) Directorate. It would also help manage subcontractor agreements and be responsible for on-time delivery of the radar prototypes.1

Subject to funding, the planned request would solicit proposals for one fixed-price other transaction agreement, with payments made as specified milestones are completed. The estimated performance period is 60 months. A non-competitive follow-on production other transaction may be awarded after a successful prototype.1

The competition would be restricted to Cornerstone consortium members, with offerors submitting full technical and cost proposals in one step. The Nov. 25, 2026, special notice is for planning only and does not guarantee a future request or award.1

Companies considering the integrator role would accept responsibility for prototype delivery while forgoing competition as a performer for the program’s prototype awards. They could still perform technical monitoring, evaluation and integration of those prototype technologies for WIRE.1

Sources (1)
  1. SAM.gov opportunity record (API) sam.gov

Industry

a clean manufacturing workshop with composite parts arranged on an inspection table beside a large closed production printer, soft daylight through high windows.
Illustration.

Defense supplier Alta Max plans over $860,000 manufacturing expansion

The New Orleans packaging and components maker will add composite additive manufacturing and precision 3D scanning, with project completion expected in summer 2029.

Alta Max, which makes specialty and military packaging, seals and precision components, plans to invest over $860,000 in its New Orleans plant. The company supplies the Department of War and its prime contractors.1

Alta Max announced it will invest over $860,000

New Orleans

Equipment Alta Max will installImpossible Objects CBAM-25planned

The company will install an Impossible Objects CBAM-25 composite additive manufacturing system, CNC knife cutting, metrology-grade 3D scanning, and a die-cutting press

Work on the projectsummer 2029planned

is expected to be complete in summer 2029

Louisiana Economic Development

Sources
TGOs tgos.io

The expansion includes an Impossible Objects CBAM-25 composite additive manufacturing system, CNC knife cutting, metrology-grade 3D scanning and a die-cutting press to produce those products. The project also includes facility improvements, including a standby generator, HVAC and fire suppression.1

Louisiana Economic Development announced the project Nov. 25, 2026, with work to begin this year and completion expected in summer 2029. Alta Max is expected to create seven direct jobs while retaining 37 existing positions, with the first three new hires planned for 2029 and all seven by 2030.1

Louisiana offered Alta Max an incentives package that includes the High Impact Jobs Program. The company is also expected to participate in the state's Industrial Tax Exemption Program.1

Michael Hecht, president and CEO of Greater New Orleans, Inc., said the equipment will give Alta Max capacity to serve more work for the department and its prime contractors. The announcement identifies no specific defense program or prime contractor customer for the expansion.1

Sources (1)
  1. Louisiana Economic Development: Alta Max Expands Defense Manufacturing at New Orleans Facility www.opportunitylouisiana.gov

M&A · Private equity

precision machined metal fuel system parts arranged on a gray inspection tray in an aircraft engine machine shop, with a lathe behind the table and soft light through high windows.
Illustration.

GenNx360-backed DRT Aerospace acquires fuel system parts maker Duke Manufacturing

The aerospace engine components manufacturer adds an Ohio specialist in fuel system components machined from high-temperature alloys.

DRT Aerospace, which makes precision machined components primarily for aerospace engines, has acquired fuel system components supplier Duke Manufacturing, private equity backer GenNx360 Capital Partners announced Nov. 24.1

DRT Aerospace has acquired Duke Manufacturing

Nov. 24, 2026

DRT Aerospaceprecision machined componentsStated scope

primary focus is aerospace engine components

Duke Manufacturingfuel system componentsStated scope

machined from high-temperature alloys for aeroengine applications

Source: GenNx360 Capital Partners

Sources
TGOs tgos.io

GenNx360 says the acquisition expands DRT's manufacturing footprint. The announcement discloses no purchase price or other financial terms.1

Based in Willoughby, Ohio, Duke machines fuel system components from high-temperature alloys for aerospace engines. It employs about 70 people and makes components for aerospace and defense engine platforms. Cincinnati-based DRT operates production facilities in Connecticut, Ohio and South Carolina.1

DRT Chief Executive Rob Cohen said Duke expands the services DRT can offer existing customers and introduces DRT to new programs it can support with its existing capabilities. The announcement names no Duke customers or engine programs, leaving those additions unspecified.1

Sources (1)
  1. GenNx360 release: DRT Aerospace acquires Duke Manufacturing, Nov. 24, 2026 gennx360.com

Budget · Europe

a quiet government office with thick bound volumes on a wooden desk and closed folders beside a pen, afternoon light through tall windows.
Illustration.

Italy claims defense and domestic security spending hits 2.8% of GDP, Defense News reports

Listed procurement programs total €12.77 billion, Defense News reports, while officials' combined spending figure includes domestic security outside the defense budget.

Italian officials say defense and domestic security spending reached 2.8% of GDP in 2026, fulfilling a pledge made at July's NATO summit, Defense News reported. The budget does not clearly show the split behind that claim, the outlet reported.1

Adding Enterprise ministry procurement top-funding takes the total over EUR 12 billion

Italy’s 2026 budget

defense ministry€9.33 billion

Within that spend is the key cash for investment or procurement, which is also not specified but can be calculated, by referring to other figures, as €9.33 billion out of the defense ministry’s coffers.

listed programsEUR 12.77 billion

Adding Enterprise ministry procurement top-funding takes the total over EUR 12 billion, matching EUR 12.77 billion across listed programs

Reported by Defense News

Sources
TGOs tgos.io

For suppliers, the procurement figures in Defense News's analysis give a more specific view of procurement funding than the combined defense and domestic security share of GDP.1

For procurement, Defense News calculated €9.33 billion from the defense ministry using other budget figures. Adding Enterprise ministry funding brings procurement above €12 billion, consistent with the €12.77 billion sum of the amounts listed for individual procurement programs.1

Officials told the outlet that core defense spending reached 2.1% of GDP and domestic security accounted for another 0.7%. The budget's NATO defense total includes pensions and spending by other ministries that contribute to national defense. It reaches €48.31 billion, equivalent to 2.1% of GDP. That share is up from 2% in 2025.1

Government sources speaking on condition of anonymity told Defense News that the domestic security spending is handled outside the defense budget. They said it covers activities including frontier control, counterterrorism, protection of energy infrastructure and crisis preparation. The outlet calculated that spending at about €16.1 billion, a figure the document does not reveal.1

Italy's claimed progress toward its NATO pledge includes pensions and domestic security, Defense News reported, which limits what the 2.8% figure establishes about procurement spending.1

Sources (1)
  1. Defense News: Buried in Italy's budget, officials see Rome meeting NATO spending target www.defensenews.com

M&A · Protective equipment

thick composite panels on a clean inspection table in a composites manufacturing hall, with a bonding fixture beside the panels and production equipment behind under soft white light.
Illustration.

European investor Triton completes acquisition of armor maker Integris Composites

Triton plans additional capital and operational support to expand the composite armor supplier’s capacity and capabilities. The acquisition’s terms were not disclosed.

Triton Fund 6, advised by European mid-market investor Triton Partners, has completed its acquisition of composite armor maker Integris Composites from funds advised by Agilitas Private Equity.1 Triton announced the closing Nov. 19, following an April 7 signing.1–2

Triton will support with further capital

to scale Integris' capacities and capabilities

Triton Fund 6Integris Compositesactual

completed the acquisition of Integris Composites from funds advised by Agilitas Private Equity

At signingfurther capital, operational expertise and know-howplanned

Triton will support with further capital, operational expertise and know-how to scale Integris' capacities and capabilities

Terms and conditions of the transaction are not disclosed.

Triton Partners releases, April 7 and November 19, 2026

Sources
TGOs tgos.io

The acquisition comes with a stated plan to expand Integris’s capacity and capabilities. At signing, Triton Partners investment advisory professional Julian Pircher said the firm would provide further capital, operational expertise and knowledge drawn from investments such as RENK Group.2

Integris makes armor plates and armor kits for personal protection, land vehicles, aerospace and marine applications. Triton describes Integris as a strategic partner to defense original equipment manufacturers and to defense and law enforcement agencies.1

Triton cites its work with RENK as relevant experience.2 The firm says it supported RENK’s transformation from a corporate carve-out into a standalone business listed on the Frankfurt Stock Exchange in 2024.1

Triton’s expansion plan concerns a supplier able to develop, test and manufacture armor in-house and at scale, according to the investor.1–2 Pircher tied that expansion to meeting increasing customer demands.2

Sources (2)
  1. Triton Partners completes acquisition of Integris Composites (Nov. 19, 2026) www.triton-partners.com
  2. Triton Partners to acquire Integris Composites (April 7, 2026) www.triton-partners.com

Industry · Depot

a large white dome of composite panels on a concrete pad at an invented test facility, with low hills behind it in soft morning light.
Illustration.

Industry day planned for Tobyhanna Army Depot range expansion

The tentative December event follows last year's market research. That notice put construction magnitude between $25 million and $100 million.

An industry day for Tobyhanna Army Depot's range expansion is tentatively planned for Dec. 16, 2026, at the depot's Visitor Control Center. The scope includes a new radome enclosure and two operational test pads. The notice, posted Nov. 25, 2026, is subject to amendment.1

Industry day for the Tobyhanna Army Depot EMF Range expansion

Tentative Date: 16 Dec 2026

Radome radar enclosureapproximately 110 feet in diameter

Erect the Radome radar enclosure, approximately 110 feet in diameter, using government supplied materials.

imported fillapproximately 400,000 cubic yards

The estimated imported fill quantity is approximately 400,000 cubic yards.

Building 54approximate 4,480 SF addition

Construct an approximate 4,480 SF addition to Building 54.

Notice is subject to amendment

Source: SAM.gov industry day notice, Nov. 25, 2026. As of Nov. 25, 2026.

Sources
TGOs tgos.io

The Army Corps of Engineers' Philadelphia District issued a Dec. 23, 2025, sources-sought notice for the project. It listed a construction magnitude between $25 million and $100 million.2 That market research estimated five calendar years of work; the industry day notice gives no dollar value.1–2

The planned radome on Powder Smoke Ridge would measure approximately 110 feet in diameter and use government-supplied materials. Site work includes an embankment requiring an estimated 400,000 cubic yards of imported fill.1

Alongside the two operational test pads, the scope includes two expansion pads for existing radome pads. A weather station would provide weather calibration data to radar units on the ridge, and Building 54 would receive an approximately 4,480-square-foot addition.1

The Corps anticipated a competitive procurement when it issued the earlier notice to inform its acquisition strategy.2

The earlier market research asked respondents to demonstrate at least two projects completed in the preceding five years. Each project had to cost at least $50 million.2

Sources (2)
  1. SAM.gov: Tobyhanna Army Depot EMF Range Expansion, Industry Day (Special Notice, posted Nov. 25, 2026) sam.gov
  2. SAM.gov: Tobyhanna Army Depot EMF Range Expansion (Sources Sought, posted Dec. 23, 2025) sam.gov

Contracts · Satcom

unbranded metal network equipment modules with neat cables on a clean lab workbench under soft white light. dish antennas visible through a window.
Illustration.

Navy plans sole-source Comtech modem upgrades for medium Earth orbit

The Navy cites the manufacturer's exclusive data and source-code rights for its sole-source approach. The planned contract also covers Space Force certification support.

The Navy plans to buy medium Earth orbit (MEO) firmware upgrades for the SLM-5650B satellite modem through a sole-source contract with its manufacturer, Comtech Satellite Network Technologies.1

NIWC Pacific intends to award Comtech Satellite Network Technologies a sole-source, firm-fixed-price contract

for the SLM-5650B satellite modem

Naval Information Warfare Center Pacificsole-source, firm-fixed-price contractplanned

NIWC Pacific intends to award Comtech Satellite Network Technologies a sole-source, firm-fixed-price contract with a 12-month period of performance under FAR Subpart 13.5

proprietary data, designs and source-code rights

Comtech, as OEM, retains the proprietary data, designs and source-code rights needed to modify the existing modem baseline

Source: Navy notice, SAM.gov.

Sources
TGOs tgos.io

Comtech holds the exclusive proprietary data, technical designs and source-code rights needed to modify the existing modem baseline. The Navy says Comtech alone can meet the requirement without substantial duplication of costs and unacceptable operational delays to Navy communication readiness.1

The Naval Information Warfare Center Pacific plans a firm-fixed-price contract with a 12-month period of performance. The notice was posted Nov. 25, 2026. Responses are due Nov. 27.1

The work includes manufacturer engineering services, Space Force Delta-8 Wideband Global SATCOM (WGS) certification and Joint SATCOM Engineering Center testing support.1

The notice gives no contract value or number of modems or ships and names no MEO constellation or service.1

The Navy ties its sole-source case to Comtech's proprietary rights, which are needed to modify the existing modem baseline while preserving backward compatibility with legacy Fleet geostationary satellite networks. The work must also sustain the modem's mandatory National Institute of Standards and Technology Federal Information Processing Standard (FIPS) 140-2 Level 2 security validations.1

Sources (1)
  1. SAM.gov opportunity record sam.gov

Contracts · Launch infrastructure

an invented steel service tower with scaffolding around it beside a wide concrete pad, morning light over flat scrubland.
Illustration.

Launch deltas explore construction consortium for spaceport overhaul

The proposed structure would manage pre-qualified builders and support Other Transaction construction awards. Industry feedback is due Dec. 17.

Space Launch Deltas 30 and 45 are asking industry how to organize a construction consortium for a spaceport infrastructure overhaul. The deltas say the infrastructure effort aims to eliminate operational bottlenecks and support increased national security and commercial launch activity.1

Two consortium structure options are presented in the SpOCC Structure Options attachment

Spaceport Operational Construction Consortium (SpOCC) Request for Information

Structure Option A – Single Consortium/Construction Manager

Structure Option B – Separate Consortium & Construction Manager

The notice calls the program potential

Source: SAM.gov, SpOCC Request for Information and Structure Options attachment

Sources
TGOs tgos.io

The request for information, posted Nov. 25, 2026, envisions pre-qualified pools of builders and assistance drafting, soliciting and executing Other Transaction construction awards.1–2 It asks how management fees could be limited to maximize funding for project design and construction.1

Alongside the consortium, the government is exploring an owner's advisory partner for capital program evaluation, independent expert reviews and program-level optimization. Agreement options range from one covering both services at both deltas to four separate agreements, one per service at each delta.1 An attachment also presents alternatives combining or separating consortium and construction management.1, 3

The government seeks governance models that prevent the consortium manager from becoming a traditional prime layer insulating builders from government technical oversight. It also asks how to prevent conflicts of interest when the manager provides post-award inspections. The program remains potential, with no dollar value or project list stated in the notice or attachment.1

For builders and prospective managers, the acquisition approach remains open to industry input on how work is organized, management fees and oversight.1 Responses are due Dec. 17, 2026, at 2 p.m. Pacific; the government will treat feedback as public market research to shape its acquisition approach.1

Sources (3)
  1. SAM.gov: SpOCC Request for Information, SLD30-SLD45_SpOCC sam.gov
  2. SAM.gov: first version of the notice sam.gov
  3. SpOCC Structure Options attachment sam.gov

Industry · Coproduction

a generic carbon-fiber aircraft frame on a clean assembly workbench with plain composite wing panels laid out beside it, soft daylight through high windows in a modern production hall.
Illustration.

Germany to fund Ukrainian reconnaissance drone production

A Ukrainian-German joint venture in Germany plans to manufacture several thousand drones for tactical reconnaissance and surveillance in 2027.

Germany will finance drone production, the establishment of the necessary production capacity and further support for a new joint venture in Germany, Ukraine's Ministry of Defence announced Nov. 24.1

The German side will finance production

A joint venture in Germany

The German sidewill finance productionplanned

The German side will finance production, the establishment of the necessary production capacity, and further support.

Ukrainian-German joint ventureseveral thousandplanned

In 2027, the Ukrainian-German joint venture plans to manufacture several thousand Ukrainian drones for tactical reconnaissance and surveillance.

Ministry of Defence of Ukraine, November 24, 2026

Sources
TGOs tgos.io

Ukraine's Minister of Defence Evgeniy Khmara and German Defence Minister Boris Pistorius signed the implementation agreement in Berlin. A Ukrainian company and a German company are establishing the venture, which plans to manufacture several thousand Ukrainian tactical reconnaissance and surveillance drones in 2027. The ministry named neither company and gave no funding amount.1

The ministry counts the new venture as Ukraine's 12th joint defense production project with partner countries, bringing the number with Germany to six.1

Khmara said the drones will help Ukrainian troops see the battlefield better and plan and carry out combat missions. The project also provides for the possibility of increasing supplies to Ukraine's Defence Forces in the future.1

Sources (1)
  1. Ministry of Defence of Ukraine: Ukraine and Germany set up joint production of Ukrainian reconnaissance drones for the Defence Forces, Nov. 24, 2026 mod.gov.ua