Sunday, November 8, 2026
TGOs

The business of defense

Get the Weekly

Contracts · Electronic warfare

Navy plans to solicit Boeing for Growler Beowulf development

The planned work covers prototypes and aircraft integration for U.S. and Australian Growlers, with performance anticipated from March 2028 through March 2033.

The Navy intends to solicit Boeing for a follow-on contract to design, develop, integrate and test the Growler Block II Phase 2 Beowulf system for U.S. and Australian EA-18G aircraft.1

NAVAIR intends to solicit The Boeing Company

Beowulf prototype leading-edge flaps and control units

Naval Air Systems Commandfollow-on Cost-Plus-Incentive-Fee (CPIF) contractplanned

intends to solicit The Boeing Company for a follow-on Cost-Plus-Incentive-Fee (CPIF) contract with a Firm-Fixed-Price (FFP) option Contract Line Item Number (CLIN) for hardware

The notice is market research to identify small and other-than-small firms capable of providing the supplies/services before the method of acquisition is determined

The government is under no obligation to award a contract as a result of the notice

Source: Naval Air Systems Command, SAM.gov

Sources
TGOs tgos.io

A sources-sought notice posted Nov. 5, 2026, seeks capable small and other-than-small businesses before the Navy determines its acquisition method. The notice is market research ahead of any request for proposals, and the government is under no obligation to award a contract.1

The planned effort covers non-recurring engineering, eight Beowulf prototype inboard leading-edge flaps, sensor control units and power control units for U.S. Navy and Royal Australian Air Force cooperative EA-18G aircraft. Its scope also includes flight software and firmware, flight qualification and test support, aircraft integration, laboratory test assets, a validated technical data package and logistics products.1

The Naval Air Systems Command's PMA-265 program office plans a cost-plus-incentive-fee contract with a firm-fixed-price hardware option. Performance is anticipated from March 2028 through March 2033. The planned effort includes an option for long-lead material in fiscal 2030.1

The notice names Boeing, but other firms have until 11:59 p.m. Eastern on Nov. 20 to show they can provide the supplies and services it describes. Any decision not to compete the proposed contract action based on the responses remains at the government's sole discretion.1

Sources (1)
  1. SAM.gov opportunity record sam.gov
Keep readingBack to top ↑

Next story

Contracts · Test instrumentation

Air Force plans sole-source Boeing contract for cruise missile test kits

The planned base lot covers 15 kits used in Air Launched Cruise Missile test flights. No award will be made until funds are available.

The Air Force intends to award Boeing a sole-source production contract for 15 test instrumentation kits used in Air Launched Cruise Missile (ALCM) test flights.1 The presolicitation was posted Oct. 30, 2026.2

Intent to award a sole source contract to The Boeing Company

Common Airborne Telemetry and Instrumentation Kit (CATIK)

base production lot15 CATIKsplanned

Current acquisition strategy is a definitive firm-fixed-price contract for a base production lot of 15 CATIKs

options15 flight termination batteries and 15 instrumentation batteriesplanned

with options for 15 flight termination batteries and 15 instrumentation batteries

Delivery is expected to complete within 18 months after award.

Funds are not presently available for this effort. No award will be made until funds are available.

Source: SAM.gov presolicitation. As of Oct. 30, 2026.

Sources
TGOs tgos.io

The kits process multiple subsystem inputs, including flight computer, engine, navigation, range safety, warhead and instrumentation signals, and route output to an embedded encryption device for secure telemetry. The production effort covers procurement, assembly, testing, qualification and delivery of kit shipsets, line and shop replaceable units, and flight termination system components.1

The Air Force Nuclear Weapons Center's Missile Sustainment Division at Tinker Air Force Base, Oklahoma, manages the effort. The current acquisition strategy calls for a definitive firm-fixed-price contract, with options for 15 flight termination batteries and 15 instrumentation batteries alongside the base kit lot.1

The Air Force expects the solicitation on or before Nov. 16, 2026, but reserves the right not to solicit the requirement or to cancel after issuance.1

Funds are not presently available for the effort, and no award will be made until they are. The Air Force expects delivery to be completed within 18 months after award.1

Sources (2)
  1. SAM.gov presolicitation FA8128-27-R-B00X, record data sam.gov
  2. SAM.gov notice version history sam.gov

Next story

Contracts · Data rights

Space Force plans sole-source Boeing satcom contract, citing insufficient data rights

The estimated ceiling is about $945.9 million with options. Space Systems Command says Boeing has repeatedly declined requests to sell the data rights needed to compete the work.

Space Systems Command plans to award Boeing a sole-source contract to sustain military satellite communications systems, citing insufficient government rights to the technical data needed for competition.1

Space Systems Command intends to award a sole-source IDIQ contract to The Boeing Company

Wideband and Narrowband Global SATCOM Sustainment (WNGSS) IDIQ Contract

Space Systems CommandThe Boeing Companyplanned

intends to award a sole-source Indefinite Delivery, Indefinite Quantity (IDIQ) contract to The Boeing Company

data license rights

The notice says the Government does not possess sufficient data license rights for the technical data packages, flight software source code or SATSIM simulators to permit a competitive acquisition.

Source: Space Systems Command, SAM.gov presolicitation notice 26-18

Sources
TGOs tgos.io

The command says it lacks sufficient license rights to technical data packages, flight software source code and satellite simulators. Its Oct. 27, 2026, presolicitation notice says Boeing repeatedly declined requests to sell the necessary rights, but gives no Boeing explanation for those decisions. The notice says the data was developed at private expense and includes design documentation for Boeing's 702HP and 702MP satellite platforms, simulators and ground control software.1

The planned indefinite delivery, indefinite quantity contract has an estimated ceiling of approximately $945.9 million if all options are exercised. The five-year base ordering period has an estimated ceiling of $480.6 million. The ten-year optional ordering period has an estimated ceiling of $465.3 million. Both figures are estimated ceilings, not obligated funds; responses to the notice are due Nov. 17.1

The work covers the Wideband Global SATCOM (WGS) and Ultra High Frequency Follow-On constellations, including round-the-clock anomaly analysis, fault isolation and recovery, and end-of-life disposal. It also includes sustaining engineering and software maintenance for the Global SATCOM Configuration and Control Element ground system.1

The command's rationale ties competition for ongoing satellite support to access to technical data. It says another contractor working without that data would introduce substantial duplication of government cost and unacceptable delays and risk to satellites in orbit.1

Sources (1)
  1. SAM.gov opportunity record sam.gov